Venezuela Avenue Pipeline Installation

Installation of a 48” GRP pipeline for the expansion of the Santo Domingo Sewer, running from the Rotary Club-San Vicente intersection to the Venezuela Avenue-Club Activo 20-30. Works also included installing several special parts, such as siphons & elbows, ‘Tee-Yee’ connectors, registers and valves. The project’s goal was to supply water to the tanks of the Darío Contreras Hospital, which is a major public health facility.

Services provided by the firm:

• Construction of civil works

• Engineering and detail design during construction

Santo Domingo Beltway, Section IIB Construction

Section IIB is the continuance of Section II of the Santo Domingo beltway (Circunvalación), the most important highway in the Dominican Republic, which starts in Haina, connects with the Duarte Highway and continues until the Northeastern Highway.

This work of Dominican engineers will connect the national manufacturing industry with the country’s ports and airports to promote exports of local goods as well as imports of raw materials needed to finish certain products.

Services provided by the firm:

• Construction of civil works

• Engineering and detail design during construction

Hato Mayor–El Puerto Highway Construction

Construction of the Hato Mayor-El Puerto Highway is performed on a 22.56 km long flat topography. The road section has two lanes of 3.5 m each and 1.2 m promenades. The project includes the construction of 8 bridges and 33 sewers along the way. Also, the conditioning of the Yerba Buena road’s speed humps, with over 40 m of 42-inch reinforced concrete pipelines for river and creek crossing (transversal drainage).

Services provided by the firm:

• Construction of civil works

• Engineering and detail design during construction

Cienfuegos Aqueduct Construction, Engineering and Design

The Cienfuegos Aqueduct has a treatment capacity of 23 million gallons daily and two storage tanks. It serves a population of 300 thousand people with a water demand of nearly 20 million gallons per day. This project not only benefits Cienfuegos, but also nearby communities such as La Tinaja, Quinigua, Monte Rico, San Lorenzo, La Piña, Santa Lucía, El Fondo de la Botella, El Ingenio Abajo and El Ingenio Arriba, as well as the Mella I & II and Espaillat urbanizations, and the Espaillat Mera and Santiago Norte Pisano industrial parks.

Services provided by the firm:

• Design for the construction of civil works

• Construction of civil works
• Engineering and detail design during construction

Military Zone-Circunvalación de Santo Domingo Beltway Construction

Circunvalación de Santo Domingo-Zona Militar is a road built to connect the military zone located on Pedro Brand with the Santo Domingo beltway and it is approximately 1.3 km long.

Services provided by the firm:

• Construction of civil works

• Engineering and detail design during construction

PIISA Connector (CSDT2)

The Cienfuegos Aqueduct has a treatment capacity of 23 million gallons daily and two storage tanks. It serves a population of 300 thousand people with a water demand of nearly 20 million gallons per day. This project not only benefits Cienfuegos, but also nearby communities such as La Tinaja, Quinigua, Monte Rico, San Lorenzo, La Piña, Santa Lucía, El Fondo de la Botella, El Ingenio Abajo and El Ingenio Arriba, as well as the Mella I & II and Espaillat urbanizations, and the Espaillat Mera and Santiago Norte Pisano industrial parks.

Services provided by the firm:

• Construction of civil works

• Engineering and detail design during construction

Circunvalación Santo Domingo Beltway, Section IIA Construction

Considered the most important highway in the Dominican Republic, the Circunvalación Santo Domingo beltway starts in Haina, connects with the Duarte Highway and continues until the Northeastern Highway. This work of Dominican engineers will connect the national manufacturing industry with the country’s ports and airports to promote exports of local goods as well as imports of raw materials needed to finish certain products.

Services provided by the firm:

• Construction of civil works

• Engineering and detail design during construction

Hato Mayor-Sabana de la Mar Highway

The Hato Mayor-Sabana de la Mar road belongs to a segment of Road 103 from the country’s vial network. It is not only the most important road connecting Hato Mayor and Sabana de la Mar, but it also connects the smaller communities nearby. The road is 44.2 km long and has bridges, tubular sewers of 36, 48, 60 inches in reinforced concrete.

A series of complementary works are being built around this project, including a sewer system at the Arenita community, construction of a tubular speed bumps, canalization of the Yanigua River, construction of a speed bump over the Yabón River, construction of gabion walls and the reconstruction of the baden-bridge over the Jagüera River.

Due to the fact that this project is under construction, and most importantly, due to the transport needs of area residents, the Ministry of Public Works and Communications (MOPC) signed and agreement with construction company Conidec in 2017 to include it in the emergency projects program.

Services provided by the firm:
• Construction of civil works
• Engineering and detailed design during construction