- Client: Public Works and Communications Ministry (MOPC)
- Date: February 2005 - December 2006
- Contract: RD$ 16,500,000.00
- Constructor asociado: N/A
Reinforcement installation on the metallic structure, reconstruction of the suspension cable system and application of a protection painting system on the entire structure. Also, lighting, asphalt, vial protection and rain drainage.