- Client: Public Works and Communications Ministry (MOPC)
- Date: April 2017 - April 2018
- Contract: RD$ 246,196,000.00
- Constructor asociado: Estrumet Metalmecánica
Reinforcement installation on the metallic structure, reconstruction of the suspension cable system and application of a protection painting system on the entire structure. Also, lighting, asphalt, vial protection and rain drainage.